G&H ENGINEERING, SUNDERLAND

Overview

Location: Sunderland
Type: Gas
Client: G&H Engineering

  • Gas De-Commission and Remove a Spool Piece. Cap Off and Re-Test.
  • ⁠⁠Isolate then drain down of LTHW Services, and spade off valves. Ready for strip out.
  • Isolate all pipework to the radiator positioned on their roof, and drain the coolant into the IBC Tank provided. *This is harmful to put into the drainage system!
  • ⁠⁠⁠⁠Disconnect – The Cold Feed for Heating Top Up, and Cap Off.
  • Disconnect – Oil Connections to The Engine, and Cap Off.
  • ⁠⁠Disconnect – Exhaust Flue from CHP.

Gallery

OTHER CASE STUDIES