Overview
Location: Sunderland
Type: Gas
Client: G&H Engineering
- Gas De-Commission and Remove a Spool Piece. Cap Off and Re-Test.
- Isolate then drain down of LTHW Services, and spade off valves. Ready for strip out.
- Isolate all pipework to the radiator positioned on their roof, and drain the coolant into the IBC Tank provided. *This is harmful to put into the drainage system!
- Disconnect – The Cold Feed for Heating Top Up, and Cap Off.
- Disconnect – Oil Connections to The Engine, and Cap Off.
- Disconnect – Exhaust Flue from CHP.



















